
A large chimney repair, broken into stages you can plan
Ask for a staged plan
Describe the findings on your report and we will sort them into stages with prices.
A sample three-stage plan
Here is how a typical report with several findings on an older Azusa house might be split. The order follows what each item puts at risk, not what is cheapest or easiest.
In a sale, stage one is usually what a buyer's lender or insurer asks to see fixed. Stages two and three are where a repair credit often comes in.
- Stage one, now: cracked or missing flue liner, gaps that let heat reach framing, a missing spark-stopping cap
- Stage two, before the next wet season: cracked crown, failed flashing, a roof-line leak, a missing cricket
- Stage three, when budget allows: a stiff or rusted damper, a worn chase cover, a gas insert to replace an old wood fireplace
Why safety comes before water
A flue that lets heat or exhaust reach wood framing is a fire and carbon monoxide risk the first time the fireplace is lit. That is why liner and clearance items go first, even when they cost more than the visible problems on the roof.
Water damage is slower. A cracked crown or loose flashing lets rain into the brick each winter, and the damage grows, but it does not put anyone in the house at risk on day one. Owners who cannot do everything at once should spend on stage one first.
How each stage is priced
Four stage items have a published price: leak repair, a cricket, a cricket with new flashing, and a gas insert. Those appear in the table below. The cap is quoted after we measure. Everything else, including liners, crowns, dampers, chase covers and flashing on its own, is quoted in writing for that stage after we have seen it, because height, access and material change the work.
Each stage comes on its own page, so it can be approved, credited or put off without reopening the others.
Published prices by stage
These are the stage items with a fixed price or range. The cap is quoted after we measure, and the rest of a staged plan is quoted in writing.
- Stage two: finding and sealing where rain gets in
- $530 to $3,150
- Stage two: water-splitting saddle behind the stack
- $420 to $955
- Stage two: saddle plus all-new metal at the roof line
- $635 to $1,600
- Stage three: sealed gas unit set into the old firebox
- $2,650 to $5,300
- Re-check after the work, with camera
- $370
- Stage one: spark-stopping top over the flue
- Quoted after we measure
Liners, crowns, dampers, chase covers and stand-alone flashing are quoted per job in writing after the inspection.
Questions about staged repairs
Do I have to do every stage?
No. Stage one covers the items that put the house at risk and should be done before the fireplace is used. Later stages can be planned, credited in a sale, or left for a future owner.
Can stages be done by different companies?
Yes. Each stage is quoted on its own page so you can compare or split the work.
How does staging work in escrow?
Often the seller fixes stage one before close and the buyer takes a credit for the later stages, based on our written quote. The agents decide that, not us.
Will you re-inspect after the repairs?
If you want proof for a buyer, lender or insurer, we can do a Level 2 after the work and send the new report to everyone on the file.
Why do some items have no price?
Liners, crowns, dampers and similar work change too much from house to house to list one figure. We quote those in writing for your chimney.
Turn the report into a plan
Tell us what the inspection found, and we will sort the findings into stages and put a price on each one.
Call (626) 557-0083